We have now begun extensive editing of our footage and we are quite satisfied with some of the shots we have captured. However, we had initial difficulties after losing a portion of our edited footage but I managed to restore the data previously lost and we can now continue.
 
Due to the teachers strike, the stage in the hall was free for use all day, and we used the opportunity to begin filming our performance. 

We used a lot of equipment, including:
  • Extension cable
  • 2 construction lights and 2 lamps
  • Bass guitar/bass guitar straps
  • Electric guitar/strap
  • Microphone stand
  • Drum kit
  • Tracking
  • Tripods
  • Stage lighting
  • Light reflectors/defusers

We spent about 5 hours filming, concentrating on the different instruments accordingly as well as trying different angles to film the whole band performance. The session resulted in some very good shots and lighting effects!